For the construction of a total of 20 wind turbines on the Stubalpe, an Environmental Impact ...
Ecological construction management for the construction work in the root area of 56 trees as part ...
For the district heating line Graz Heinrichstraße 880 m district heatin pipe were ...
Photovoltaic systems with a total capacity of 610 kWp have been planned for three ...
10 wind energy plants with a total capacity of 13 MW have been erected on the Rattener Alp. The ...
Increasing the transmission capacity of the existing district heating transmission line ...